SM Superheated 38 Kg/cm2g 381 C. SL Superheated 3.5 Kg/cm2g 260 C. There are two service boilers and two HRSG boilers in offsite which can generate 100te/hr each at 112Kg/cm2 and 510 DegC. Normally one service boiler and one HRSG boiler are in service. High pressure steam from boiler is distributed to Ammonia plant and Urea plant.Learn More
Boiler body kg 183 230 230 265 265 300 300 Boiler body with transport pallet kg 210 260 260 295 295 330 330 contained in sprays, paints, solvents and cleaning agents) Prevent very dusty conditions Prevent high levels of humidity 7.38/ 32.49 36.9 *3 Corresponds to the rated heat input of the boiler.Learn More
Vitocrossal 200, type CM2 Gas condensing boiler: no cleaning agent gets between the boiler body and Boiler body kg 446 512 581 Boiler incl. burner, thermal in-sulation and boiler control unit kg 597 687 758 Capacity boiler water litres 402 430 503 Boiler connectionsLearn More
Nov 30, 2011 · A guideline would be to aim for lkg/cm2 after 2 hours firing, 5kg/cm2 after 2.75 hours firing and 12 kg/cm2 after 3.25 hours firing. f) When the drum pressure has risen to about 2 kg/cm2, close the drum vent valve. g) Drain and warm through all steam supply lines to ancillary equipment before putting the boiler on load.Learn More
Note 1 - Recovery Boilers - The boiler feed water used shall be completely de-mineralized and also the boiler feed water and boiler water shall be conditioned in accordance with high pressure boilers working at 60 kg/cm2 and above b Shall not apply if reducing agents other than sodium sulphite are used.Learn More
The aim of Chemical Cleaning is to is to safely remove all deposits from the inside of the boiler tubes. mill scale, oil, paint, preservatives, rust, welding slag's that would have entered Learn More
Steam Pressure at RH outlet kg/cm2 37.07 Steam Temperature at RH outlet 0C 540 Feed Water Temperature at inlet of Economiser 0C 245 Feed Water Temperature at outlet of Economiser. 0C 277 (b) FURNACE:- The boiler is equipped with a water cooled furnace of balanced draft and fusion welded membrane wall construction. It isLearn More
Boiler Steam Minimum pressure 6 Kg/cm2 Pure Steam Generator is designed to produce sterile, pyrogen free steam conforming to I.P./B.P & LAL TEST specifications. D.M.Feed Water is fed to the 1st & 2nd Pre-Heater where it gets heated nearly to the boiling point.Learn More
From safety point of view, REVOTECH is fully safe as it is having all safety precautions. REVOTECH is available in a wide range of steam generating capacities from 50 Kgs/hr to 1000 Kgs/hr F & A 100°C designed for maximum pressure of 15 Kg/cm2 at overall efficiency of 88± 2% on N . C . V. P & I DIAGRAM OF AN OIL FIRED STEAM BOILER - REVOTECHLearn More
2. BOILERS Bureau of Energy Efficiency 27 Syllabus Boilers: Types, Combustion in boilers, Performances evaluation, Analysis of losses, Feed water treatment, Blow down, Energy conservation opportunities. 2.1 Introduction A boiler is an enclosed vessel that provides a means for combustion heat to be transferred into water until it becomes heated water or steam.Learn More
boilers and generators, reciprocating or rotary, (38.0) 2 (51.0) 3⅝ (92) 2¾ (70) 10⅝ (270) 7¾ (3.5) a B c lb (kg) Dimensions are for reference only. 5 3 28 50 77 127 198 325 4 32 57 89 146 228 374 6 39 70 108 178 278 456 8 45 80 124 205 319 523 10 50 89 138 228 355 582Learn More
THERMODYNE TECHNOLOGY, Chennai Product Industrial Boiler – upto 105 kg/cm2 (g) pressure, 150 TPH capacity Coal/Oil/Gas fired boiler Husk/Biomass fired boiler Heat Recovery Boiler Water tube, Smoke tube or combined Small co-gen system Upto 25 TPH and 3000 KW power Heat Recovery Equipments Air Preheaters Economisers Steam Generator Pressure Parts Superheaters Economisers Boiler Bank and…Learn More
About the Boiler See inside cover for models covered by these instructions. High Level 80 cm2 to internal space - 40 cm2 to outside Low Level 80 cm2 to internal space - 40 cm2 to outside Weights Lift Weight Heat Engine 38 kg Cylinder 37 kg 41 kg 49 kg Full Weight 166 kg 202 kg 246 kg. Publication No. 5106226 5 MAX0007ALearn More
ovens were extended about 5 ft. 6 in. in front of the boiler setting, whereas the more modern Dutch oven form of furnace construction extends to 20 ft. and even 25 ft. in front of the boiler setting proper. One result of this longer gas travel has been a very marked reduction in the quantity of unburnt fuel passing through the boiler.Learn More
Nov 30, 2011 · A guideline would be to aim for lkg/cm2 after 2 hours firing, 5kg/cm2 after 2.75 hours firing and 12 kg/cm2 after 3.25 hours firing. f) When the drum pressure has risen to about 2 kg/cm2, close the drum vent valve. g) Drain and warm through all steam supply lines to ancillary equipment before putting the boiler on load.Learn More
ovens were extended about 5 ft. 6 in. in front of the boiler setting, whereas the more modern Dutch oven form of furnace construction extends to 20 ft. and even 25 ft. in front of the boiler setting proper. One result of this longer gas travel has been a very marked reduction in the quantity of unburnt fuel passing through the boiler.Learn More
About the Boiler See inside cover for models covered by these instructions. High Level 80 cm2 to internal space - 40 cm2 to outside Low Level 80 cm2 to internal space - 40 cm2 to outside Weights Lift Weight Heat Engine 38 kg Cylinder 37 kg 41 kg 49 kg Full Weight 166 kg 202 kg 246 kg. Publication No. 5106226 5 MAX0007ALearn More
Existing Boiler water TDS = 6000 ppm As per formula: Blowdown = 300 x 100 6000 – 300 = 5.263 For 2.5 TPH capacity boiler = 2.5 x 5.263 100 = 0.131 = 131 litres / hrs = 3157 litres / day Now as per chart 9.5 kg/cm2 At 9.50 kg/cm2 by having 1 inch blowdown valve diameter, we can remove 480 lit / minute.Learn More
The aim of Chemical Cleaning is to is to safely remove all deposits from the inside of the boiler tubes. mill scale, oil, paint, preservatives, rust, welding slag's that would have entered Learn More
boiler 38kg /cm2 in Horns Refinery Co. (on turn key basis) According to the special book of conditions prepared for this purpose, included types of prequalification for the bidders and as per the following conditions. BID BOND: -For local bidder S.P. 145720000/ -For foreign bidder EUR. / 90000 /Learn More